Date Posted:
14/04/2025
On behalf of Thames Water, Browne will soon be delivering a significant infrastructure project along Fonthill Road, Islington. Over the course of approximately 11 weeks, two aging cast iron mains, a 4-inch and 6-inch, will be replaced by a larger 180mm polyethylene barrier pipe. This rationalisation will improve the network's efficiency and significantly reduce the likelihood of bursts and service interruptions.
As part of the Victorian mains replacement framework, the works will be carried out in phases, allowing Fonthill Road to remain partially open, minimising disruption for residents and businesses.
News
Browne Takes Home Best Fancy Dress at Thames Water Raft Race
Last week, Browne was proud to take part in Thames Water's annual Raft Race, a longstan[...]
News
Browne Surpasses 50km of Pipeline Installation for AMP8
Browne is proud to announce that we have successfully installed more than 50km of pipeline [...]
News
Browne Volunteers Support Improvements at Cheshunt Primary School
Browne has partnered with St Paul's Catholic Primary School in Cheshunt, Hertfordshire, to [...]