Date Posted:
14/04/2025
On behalf of Thames Water, Browne will soon be delivering a significant infrastructure project along Fonthill Road, Islington. Over the course of approximately 11 weeks, two aging cast iron mains, a 4-inch and 6-inch, will be replaced by a larger 180mm polyethylene barrier pipe. This rationalisation will improve the network's efficiency and significantly reduce the likelihood of bursts and service interruptions.
As part of the Victorian mains replacement framework, the works will be carried out in phases, allowing Fonthill Road to remain partially open, minimising disruption for residents and businesses.
News
Browne Helps Keep Sidcup's Remembrance Parade Moving Safely
Browne was proud to support the Sidcup community during this year's Remembrance Parade, wor[...]
News
Browne Non-Infrastructure Delivers Rapid Water Treatment Solution at Bray Gravels
a { text-decoration: none; color: #464feb; } tr th, tr td { border: 1px [...]The temporary arrangement enabled South East Water to continue operating the asset while un[...]
News
Browne Connects Armed Forces Talent with Careers in Construction
Last week, Browne joined fellow industry leaders at the BuildForce National Armed Forces In[...]