Enhancing Wastewater Network Resilience Across Buckinghamshire

Location:

Buckinghamshire

Client:

Thames Water

Scope of works:

Stormwater Treatment Infrastructure

Delivering long-term environmental protection across the River Misbourne catchment.

Browne Group - Aerial view of a construction site with an orange excavator and a dumper truck.

Project Overview

Browne supported Thames Water in delivering a major programme of wastewater infrastructure improvements across the River Misbourne catchment in Buckinghamshire.

The scheme was developed in response to recurring flooding, groundwater infiltration and increased pressure on the wastewater network during heavy rainfall events. Centred on Amersham Wastewater Treatment Works, the programme combined stormwater treatment upgrades with wider network improvements to improve performance and support future growth.

Key Achievements

0 L/s

stormwater treatment capacity installed using advanced screening and filtration technology

0 m

of sewer rehabilitated to improve network performance and resilience

0 %

reduction in pollutant loads entering the River Misbourne through enhanced stormwater treatment

Key Challenges & Solutions

Protecting a Sensitive Chalk Stream

The River Misbourne is one of the UK's rare chalk streams, requiring careful consideration throughout design and construction. Browne delivered an advanced treatment process incorporating 3mm screening and fine filtration technology capable of significantly improving the quality of stormwater entering the receiving environment.

Maintaining Performance During Construction

The upgrade was delivered within a live operational treatment works. To maintain treatment performance throughout construction, the team installed a temporary screening and filtration system, ensuring environmental standards were maintained until the permanent assets were commissioned.

Reducing Hydraulic Pressure Across the Network

Beyond the treatment works, sewer rehabilitation, manhole sealing and pumping improvements were delivered across the catchment to address groundwater infiltration and increase available network capacity during peak rainfall events.

Key Outcomes

  • Improved the quality of treated stormwater entering the River Misbourne through the installation of advanced screening and filtration technology.
  • Rehabilitated approximately 1,700 metres of sewer and sealed 29 manholes to reduce groundwater infiltration and improve network performance.
  • Increased wastewater network capacity and reduced the risk of flooding during periods of sustained rainfall.
  • Delivered a coordinated programme of improvements that supports Thames Water's long-term investment in wastewater infrastructure across Buckinghamshire.

Our work

See our impact,
explore our projects

Renewing Critical Wastewater Infrastructure in Bibury
Case Study
Clean Water

Renewing Critical Wastewater Infrastructure in Bibury

Delivering vital wastewater upgrades in one of Britain's most popular and picturesque villages

Learn more
Exceptional performance on Thames Water’s Mains Renewal Framework
Case Study
Clean Water

Exceptional performance on Thames Water’s Mains Renewal Framework

Delivering a Resilient Water Network for Greater London and the Thames Valley

Learn more

Interested in our projects? Explore more of our work.

See all case studies
Browne Group - Close-up of an industrial cable carrier with trees and greenery blurred in the background.

At Browne we’re
proud to work with

Browne Group - Affinity Water logo in bold, dark blue text on a white background.
Browne Group - Severn Trent logo with bold, light blue text on a dark blue background divided by a thin line.
Browne Group - Multiplex logo with dark blue text on a white background.
Browne Group - Blue

Test Image Output

Standard WordPress Function:

Browne Group - A large circular metal pipe flange embedded in a concrete wall.

Direct URL Approach:

Test image