Location:
Bibury, Gloucestershire
Client:
Thames Water
Contract value:
£1.8 million
Scope of works:
Rising Main Replacement
Delivering vital wastewater upgrades in one of Britain's most popular and picturesque villages.
of new PE100 rising main installed to strengthen network resilience and reduce future failures.
traffic diversions successfully managed while maintaining customer access and supporting local businesses.
ahead of scheduled completion despite challenging ground and weather conditions.
Browne was appointed by Thames Water to replace 1,185m of ageing wastewater rising main in the heart of Bibury, Gloucestershire, as part of the AMP8 Rising Main Programme. The existing 50-year-old pipeline had suffered four bursts in the previous decade, creating an increasing risk to network resilience and local communities.
Set within one of the UK's most iconic tourist destinations, the project required far more than technical delivery. Working alongside Thames Water, local authorities, businesses and residents, Browne installed a new PE100 rising main while maintaining access to homes, supporting local businesses and minimising disruption to thousands of visitors.
To reduce risk and avoid disturbing the fragile existing asset, the new pipeline was installed on the opposite side of the road. This enabled offline construction without the need for costly tankering operations, providing a long-term solution while reducing disruption to the local community.
Protecting a Thriving Tourist Destination
Located in the heart of the Cotswolds, Bibury attracts thousands of visitors each year and is home to a range of businesses that rely on tourism. Browne worked closely with Gloucestershire County Council, coach operators, emergency services and local businesses to carefully plan the project around peak visitor periods and maintain access throughout the works.
Putting the Community First
Early engagement played a critical role in the project's success. Our team held community drop-in sessions, conducted door-to-door engagement and maintained regular communication throughout the works. By listening to concerns and adapting our approach, we successfully accommodated local events, church access and property access requirements while building trust with residents
Overcoming Complex Engineering Challenges
The scheme included a directional drill beneath the River Coln and challenging excavation through hard rock. Despite delays caused by difficult ground conditions and winter weather, the team recovered lost time and completed the project ahead of schedule without compromising safety, quality or customer experience.
"At one stage, the team was a week behind schedule. To finish a week early is a true testament to the dedication and hard work of everyone involved – especially the team on site, who persevered through all types of weather to keep the project moving forward.
Browne has handled every challenge presented by Gloucestershire County Council and the residents of Bibury with a consistently professional and positive attitude. This project was never going to be straightforward, yet you have demonstrated remarkable resilience throughout."
Exceptional performance on Thames Water’s Mains Renewal Framework
Delivering a Resilient Water Network for Greater London and the Thames Valley
Complex trunk main installation for Affinity Water in St Albans
Delivering Critical Trunk Main Infrastructure for Affinity Water in St Albans