Menu

Project

Renewing Critical Wastewater Infrastructure in Bibury

Location:

Bibury, Gloucestershire

Client:

Thames Water

Contract value:

£1.8 million

Scope of works:

Rising Main Replacement

Delivering vital wastewater upgrades in one of Britain's most popular and picturesque villages.

Browne Group - Aerial view of a village with stone houses, green trees, open fields, and a blue sky with scattered clouds.

Key Achievements

0 m

of new PE100 rising main installed to strengthen network resilience and reduce future failures.

0 km

traffic diversions successfully managed while maintaining customer access and supporting local businesses.

0 week

ahead of scheduled completion despite challenging ground and weather conditions.

Project Overview

Browne was appointed by Thames Water to replace 1,185m of ageing wastewater rising main in the heart of Bibury, Gloucestershire, as part of the AMP8 Rising Main Programme. The existing 50-year-old pipeline had suffered four bursts in the previous decade, creating an increasing risk to network resilience and local communities.

Set within one of the UK's most iconic tourist destinations, the project required far more than technical delivery. Working alongside Thames Water, local authorities, businesses and residents, Browne installed a new PE100 rising main while maintaining access to homes, supporting local businesses and minimising disruption to thousands of visitors.

To reduce risk and avoid disturbing the fragile existing asset, the new pipeline was installed on the opposite side of the road. This enabled offline construction without the need for costly tankering operations, providing a long-term solution while reducing disruption to the local community.

Key Challenges & Solutions

Protecting a Thriving Tourist Destination

Located in the heart of the Cotswolds, Bibury attracts thousands of visitors each year and is home to a range of businesses that rely on tourism. Browne worked closely with Gloucestershire County Council, coach operators, emergency services and local businesses to carefully plan the project around peak visitor periods and maintain access throughout the works.

Putting the Community First

Early engagement played a critical role in the project's success. Our team held community drop-in sessions, conducted door-to-door engagement and maintained regular communication throughout the works. By listening to concerns and adapting our approach, we successfully accommodated local events, church access and property access requirements while building trust with residents

Overcoming Complex Engineering Challenges

The scheme included a directional drill beneath the River Coln and challenging excavation through hard rock. Despite delays caused by difficult ground conditions and winter weather, the team recovered lost time and completed the project ahead of schedule without compromising safety, quality or customer experience.

Key Outcomes

  • Installed a modern, resilient wastewater asset that will help reduce the risk of future failures and improve long-term network performance.
  • Successfully delivered a complex infrastructure project within a sensitive rural and tourist environment while maintaining strong relationships with residents, businesses and stakeholders.
  • Completed the works one week ahead of schedule despite challenging conditions, minimising disruption and protecting the peak Christmas trading period for local businesses.
  • Received recognition from Gloucestershire County Council for the team's professionalism, resilience and collaborative approach throughout the project.

"At one stage, the team was a week behind schedule. To finish a week early is a true testament to the dedication and hard work of everyone involved – especially the team on site, who persevered through all types of weather to keep the project moving forward.

 

Browne has handled every challenge presented by Gloucestershire County Council and the residents of Bibury with a consistently professional and positive attitude. This project was never going to be straightforward, yet you have demonstrated remarkable resilience throughout."

Kirsty Boddy, Roadspace Coordinator (Cotswolds), Gloucestershire County Council

Our work

See our impact,
explore our projects

Exceptional performance on Thames Water’s Mains Renewal Framework
Case Study
Clean Water

Exceptional performance on Thames Water’s Mains Renewal Framework

Delivering a Resilient Water Network for Greater London and the Thames Valley

Learn more
Complex trunk main installation for Affinity Water in St Albans
Case Study
Clean Water

Complex trunk main installation for Affinity Water in St Albans

Delivering Critical Trunk Main Infrastructure for Affinity Water in St Albans

Learn more

Interested in our projects? Explore more of our work.

See all case studies
Browne Group - Close-up of an industrial cable carrier with trees and greenery blurred in the background.

At Browne we’re
proud to work with

Browne Group - Affinity Water logo in bold, dark blue text on a white background.
Browne Group - Severn Trent logo with bold, light blue text on a dark blue background divided by a thin line.
Browne Group - Multiplex logo with dark blue text on a white background.
Browne Group - Blue

Test Image Output

Standard WordPress Function:

Browne Group - Two workers in high-visibility clothing and hard hats review a blueprint while operating a control panel.

Direct URL Approach:

Test image