Enisca Browne delivered two complex infrastructure projects: the Runleywood Borehole for Affinity Water and a pumping station at Walthamstow Wetlands for Thames Water. Both required careful planning in sensitive environments to minimise disruption and meet strict standards.
At Runleywood, a 320m borehole was drilled on a constrained residential site. At Walthamstow, the team built a new pumping station with a rising main, two pipe bridges, and a 100m under-river directional drill to support long-term operations.